Technical Specification of Gangway
(CHEC NO: 13303)
(CLIENT NO: 013)
China Engineering Co. Ltd. (C)
September, 2015
Issue status:
register for | ||||||
0C | Sep. 2015 2014 | FOR APPROVAL | ||||
Rev. | Date | Description | Prep’d | Chk’d | Rev’d | App’d |
CONTENTS
1 GENERAL 错误!未定义书签。
1.1 FIELD OF APPLICATION 错误!未定义书签。
1.2 DEFINITION OF ITEMS 错误!未定义书签。
2 REFERENCE DOCUMENTS 错误!未定义书签。
2.1 APPLICABLE CODES AND STANDARDS 错误!未定义书签。
2.2 APPLICABLE PROJECT DOCUMENTS 错误!未定义书签。
2.3 EXCEPTIONS TO REFERENCE DOCUMENTS 错误!未定义书签。
2.4 DOCUMENTS ORDER OF PRECEDENCE 错误!未定义书签。
3 SCOPE OF SUPPLY 错误!未定义书签。
3.1 EQUIPMENT SUPPLY 错误!未定义书签。
3.2 EXCLUSIONS 错误!未定义书签。
3.3 BOUNDARY LIMITS 错误!未定义书签。
3.4 ERECTION WORKS 错误!未定义书签。
4 INSTALLATION DATA 错误!未定义书签。
4.1 SITE LOCATION AND ENVIRONMENTAL CONDITIONS 错误!未定义书签。
4.2 AREA CLASSIFICATION 错误!未定义书签。
5 GENERAL SERVICE CONDITIONS 错误!未定义书签。
5.1 PROCESS 错误!未定义书签。
5.2 OPERATING AND DESIGN CONDITIONS 错误!未定义书签。
6 DESIGN AND CONSTRUCTION 错误!未定义书签。
6.1 MATERIALS 错误!未定义书签。
6.2 DESIGN REQUIREMENTS 错误!未定义书签。
6.3 SWIVEL JOINTS AND STRUCTURAL BEARINGS 错误!未定义书签。
6.4 QUICK-CONNECT/DISCONNECT CARGO COUPLERS (QCDC) 错误!未定义书签。
6.5 SPOOL PIECES 错误!未定义书签。
6.6 POWERED EMERGENCY RELEASE COUPLINGS (PERC) 错误!未定义书签。
6.7 ACCESSORIES 错误!未定义书签。
6.8 OPERATING AND CONTROL SYSTEM DESIGN 错误!未定义书签。
6.9 PAINTING, MARKING , PACKING AND PREPARATION FOR SHIPMENT 错误!未定义书签。
7 INSPECTION AND TESTS 错误!未定义书签。
7.1 MATERIALS 错误!未定义书签。
7.2 FABRICATION CONTROLS 错误!未定义书签。
7.3 SHOP TESTS 错误!未定义书签。
7.4 SITE TESTS 错误!未定义书签。
7.5 CERTIFICATION TESTS 错误!未定义书签。
8 CRITERIA 错误!未定义书签。
8.1 LEAKAGE 错误!未定义书签。
8.2 PRESSURE DROP 错误!未定义书签。
8.3 CONSUMPTIONS OF STEAM 错误!未定义书签。
8.4 LOADS ON SHIP CROSSOVER FLANGES 错误!未定义书签。
9 Guarantee 错误!未定义书签。
1 General Description
This specification describes the minimum technical requirements for the design, manufacture, testing, inspection and supply of the Gangway for MARITIME TERMINAL OF MORON PETROCHEMICAL COMPLEX PROJECT. The suppliers’ scope of work shall include but shall not be limited to design, fabrication, inspection, testing, preparation for shipment, spare parts, special tools and supply of documentation and manuals. The Gangway shall be in full compliance with this specification and international standards.
This specification does not list all the technical requirements and standards. Suppliers should provide the economic, security and high quality products which shall meet the relevant international technology and standards.
Suppliers shall be responsible for the quality of the contract equipment, spare parts and technical performance.
2 Project Overview
2.1 Construction Site:
Moron Petrochemical Complex, Moron, Venezuela
2.2 Project Scale
The gangway will be installed in Berth-2. Berth-2 is designed for chemical tankers from 3,000~35,000DWT.
Marine Dimensions:
Berth 1: 39m wide x 277m long with deck top elevation at 6.0mCD.
Vessel Dimensions:
Table 2-1 Design Vessel for Berth-2(Chemical Tankers)
Unit: m
Vessel(DWT) | LOA | BEAM | Molded D | Laden Draft | |||
Ammonia (Liquid) | Smallest | Donau 5752DWT | 112 | 13 | N/A | 5.7 | Actual Vessel |
Biggest | 35,000DWT Tanker(PIANC) | 200 | 32.2 | 16.3 | 11.8 | ||
Sulfur (Liquid) | Smallest | Daiichi Tanker 2999DWT | 92.5 | 13.6 | N/A | 5.5 | Actual Vessel |
Biggest | 35,000DWT Tanker(PIANC) | 200 | 32.2 | 16.3 | 11.8 | ||
2.3 Site Data
2.3.1 Climate
Maximum temperature recorded 37 °C
Mean temperature 27 °C
Minimum temperature recorded 15 °C